Tatra T3 trams are getting better: repairs continue

Read also

Kyiv and Dnipro will transfer seven buses to Odessa: the city is in dire need of public transport

The capital of Ukraine, together with the Dnipro City Council, will provide Odessa with...

The 17th course of national resistance has started in the Kyiv region: 110 hours of training and practice ahead

The 17th basic course of national resistance has begun in the Kyiv region. Training...

Kyiv and Dnipro help Odessa with buses

Kyiv and Dnipro will transfer 7 passenger buses to Odessa to restore public transport. The cities have united to support Odessa residents.

Stole someone else's VAZ and drove it into a ditch: a 37-year-old man was detained in Yaroshivka

In the village of Yaroshivka in the Fastiv region, a 37-year-old man illegally took possession of...

Share

Experienced craftsmen at the Darnytsia tram depot are working tirelessly to update the city's tram fleet. This year, the third car of the famous type Tatra T3 is undergoing major repairs, which significantly extends its life and improves comfort for passengers.

As Tetyana Tarasko, the acting general director of Kyivpastrans, said, all work is carried out by the depot staff themselves. This is real teamwork, where each stage has its own importance.

What has already been done?

  • Ultrasonic diagnostics of the body was performed.
  • Metalworking and welding work has been performed.
  • The paintwork has been updated.
  • Electrical equipment has been replaced.
  • The heating system has been modernized.
  • A new driver's control panel has been installed.
  • Tinted windows and sturdy stainless steel stairs appeared.

What else lies ahead?

The interior is currently being renovated: the ceiling is being installed, the handrails and comfortable passenger seats are being replaced, and the fiberglass wall cladding is being updated.

The next steps include the installation of modern energy-saving lighting and a passenger information system. The stairs will receive safe yellow warning stripes. And the final touch will be the installation of an air conditioning system, which will make the journeys even more pleasant.

Interestingly, the Darnytsia depot is already preparing a fourth tram for repair, and in parallel, similar work is being carried out at the Podilskyi and Shevchenkivskyi tram depots. Each such overhaul adds more to the trams. 10 years impeccable service, ensuring reliable transportation and comfort for all residents of Kyiv.

Source: https://kyivcity.gov.ua/news/onovlennya_rukhomogo_skladu_kivpastransu_u_darnitskomu_tramvaynomu_depo_kapitalno_remontuyut_tretiy_vid_pochatku_roku_vagon_tipu_tatra_t3/