The restoration of the left bank of Kyiv is a huge problem

Read also

No power outages planned in Ukraine on Saturday

No electricity restrictions are planned in Ukraine on Saturday, May 16.

Kyiv asks for urgent support

The city has appealed to the Cabinet of Ministers and the Verkhovna Rada with a request for financial support for measures aimed at preparing for the next heating season.

A man who brought drugs to court was detained in Kyiv

A man was detained in the capital who brought drugs to court to hand them over to an acquaintance who was in custody.

Ukrainian snails will be eaten in Moldova

Ukrainian exporters have received new opportunities to work in the Moldovan market.

Ukraine may lose 28 billion hryvnias due to counterfeit cigarettes and vapes

Legal producers claim that almost the entire illegal tobacco market is formed within the country, and budget losses continue to grow.

Share

The full restoration of life in the Darnytsia and Dniprovsky districts of Kyiv is under threat due to the difficult technical condition of the infrastructure. Experts point to two key problems: the condition of the Darnytsia CHP and the difficulty of repairing sewage systems in high-rise buildings.

1. Deadlock with the repair of intra-house networks

Chairman of the Union of Utility Consumers Oleg Popenko emphasizes that restoring the sewage system in the affected high-rise buildings may be an impossible task without relocating residents.

  • Technical difficulty: For repairs, it is necessary to carry out a complete overhaul of the house with the dismantling of the risers.

  • Human factor: The work requires simultaneous access to each apartment in the entrance.

  • Consequences: In fact, renovation means complete destruction of the interior decoration of the dwelling, which not all owners will agree to.

2. The fate of the Darnytsia CHP

Heat supply depends on the stable operation of this CHP plant 1140 residential buildingsHowever, a quick restoration of the facility is unlikely.

  • Terms: According to optimistic estimates, the repairs will continue. from 6 months, depending on the degree of damage to the equipment.

  • Alternative: If the CHP cannot be launched before the onset of cold weather, the only solution will be the mass installation of modular boiler rooms where technical conditions allow.

The need for urgent planning

The situation on the left bank requires immediate decisions from the Kyiv authorities. The lack of a clear plan for decentralization of heat and water supply in the face of long-term repairs could lead to humanitarian risks for hundreds of thousands of Kyiv residents.

Visnovok: The technical challenges are so large-scale that the return to normal life in the Darnytsia and Dniprovsky districts may take a long time, requiring the intervention of not only municipal but also state authorities.